Queens Buildings

Queens Buildings - Specialist Joinery

Client: Milestone Trust - Value: £200,000 - Duration: 52 weeks - Architect: WD & RT Taggarts

RVH Critical Care Unit

RVH Critical Care Unit

Client: Belfast Trust - Value: £114,000,000 - Duration: 193 weeks - Architect: Capita Percy Thomas

Downe Hospital

Downe Hospital

Client: Down & Lisburn Trust - Value: £50,000,000 - Duration: 146 weeks - Architect: Scott Wilson

VT4, Belfast Harbour

VT4, Belfast Harbour

Client: Belfast Harbour Commissioners - Value: £37,000,000 - Duration: 60 weeks - Engineer: Hobart & Heron

Bangor Academy

Bangor Academy

Client: SEELB / Hochtief - Value: £22,700,000 - Duration: 113 weeks - Architect: McAdam Design

St. Josephs Academy

St. Josephs Academy

Client: First Class Consortium (Hochtief) - Value: £23,800,000 - Duration: 91 weeks - Architect: SMC Parr Architects

Rathfriland Road Separated Junction

Rathfriland Road Separated Junction

Client: DRD Road Services - Value: £3,500,000 - Duration: 102 weeks - Engineer: Roads Service

Borders College

Borders College

Client: Borders College, Galashiells - Value: £17,000,000 - Duration: 88 weeks - Architect: SMC Parr Architects

Lanyon Quarter Offices

Lanyon Quarter Offices

Client: Dunloe Ewart - Value: £4,900,000 - Duration: 65 weeks - Architect: WDr & RT Taggart

Derry Track Life Extension

Derry Track Life Extension

Client: Translink - Value: £9,000,000 - Duration: 48 weeks - Engineer: Hyder

Glenarm Harbour

Glenarm Harbour

Client: Larne Borough Council - Value: £3,150,000 - Duration: 68 weeks - Engineer: RPS

Dungannon Court House

Dungannon Court House

Client: Northern Ireland Court Service - Value: £9,400,000 - Duration: 104 weeks - Architect: CPD

Halifax Call Centre

Halifax Call Centre

Client: CUSP Ltd - Value: £19,500,000 - Duration: 65 weeks - Architect: McAllister Armstrong & Partners

Northern Ireland Science Park

Northern Ireland Science Park

Client: Northern Ireland Science Park Foundation Ltd - Value: £4,000,000 - Duration: 47 weeks - Architect: Building Design Partnership

Killkeel Quay Wall Repairs

Killkeel Quay Wall Repairs

Client: Northern Ireland Fisheries Board - Value: £5,000,000 - Duration: 48 weeks - Engineer: Doran Consulting

Nendrum College

Nendrum College

Client: SEELB / Hochtief - Value: £11,000,000 - Duration: 102 weeks - Architect: McAdam Design

Stormont Wharf Warehouse

Stormont Wharf Warehouse

Client: Belfast Harbour Commisioners - Value: £8,990,000 - Duration: 46 weeks - Architect: RPS

Shortlees Primary School

Shortlees Primary School

Client: First Class Consortium - Hochtief PPP Solutions (UK) Ltd - Value: £10,500,000 - Duration: 86 weeks - Architect: Parr Architects

Edenavey Retail Unit

Edenavey Retail Unit

Client: Floorform Ltd - Value: £1,217,000 - Duration: 24 weeks - Architect: Robinson Patterson Partnership Ltd

James Young High

James Young High

Client: West Lothian Council - Value: £14,300,000 - Duration: 72 weeks - Architect: SMC Parr

St Kentigerns Academy

St Kentigerns Academy

Client: West Lothian Council - Value: £15,600,000 - Duration: 78 weeks - Architect: SMC Parr Architects

Marshes Shopping Centre

Marshes Shopping Centre

Client: Marshes Ltd - Value: £37,000,000 - Duration: 60 weeks - Architect: WDR & RT Taggart

M&S Newtownabbey

M&S Newtownabbey

Client: Marks & Spencer - Value: £9,000,000 - Duration: 36 weeks - Architect: Lewis & Hickey

M&S, Forestside

M&S, Forestside

Client: Marks & Spencer - Value: £8,000,000 - Duration: 35 weeks - Architect: WDR & RT Taggart

G1 Building Glasgow

G1 Building Glasgow

Client: Dragon Developments (G1) Ltd - Value: £24,000,000 - Duration: 158 weeks - Architect: Cooper Cromar

M&S, Donegall Place

M&S, Donegall Place

Client: Marks & Spencer - Value: £17,650,000 - Duration: 36 weeks - Architect: WDR & RT Taggart

Belfast Telegraph

Belfast Telegraph

Client: Independant News and Media - Value: £4,500,000 - Duration: 30 weeks - Architect: Wayne Storey Associates

Primark Bank Buildings

Primark Bank Buildings

Client: Primark Stores Ltd - Value: £7,100,000 - Duration: 25 weeks - Architect: 3D Architects

Irish News

Irish News

Client: The Irish News - Value: £2,500,000 - Duration: 46 weeks - Architect: Mervyn Bryson

Primark Argyle Street Glasgow

Primark Argyle Street Glasgow

Client: Primark Stores Ltd - Value: £8,100,000 - Duration: 22 weeks - Architect: 3D Architects

Buchanan House, Glasgow

Buchanan House, Glasgow

Client: Stannifer Developments - Value: £21,500,000 - Duration: 121 weeks - Architect: Cooper Cromar

G1 Glasgow

G1 Glasgow - General Civil Engineering

Client: Dragon Developments (G1) Ltd - Value: £23,800,000 - Duration: 158 weeks - Architect: Cooper Cromar

Ulster Hospital Jaffe Ward

Ulster Hospital Jaffe Ward

Client: Ulster & Community Hospitals Trust - Value: £1,400,000 - Duration: 34 weeks - Architect: Whittaker & Watt

RVH Medical Vacuum

RVH Medical Vacuum

Client: Royal Group of Hospitals - Value: £215,000 - Duration: 16 weeks - Architect: Capita Percy Thomas

Ballymascanlon Hotel

Ballymascanlon Hotel

Client: O Quinn - Value: £2,077,000 - Duration: 29 weeks - Architect: Quilligan Architects

Ulster Bank Refurb.

Ulster Bank Refurb. - Specialist Joinery

Client: RBS - Value: £400,000 - Duration: 208 weeks - Architect: Mace

M&S Forestside

M&S Forestside - Specialist Joinery

Client: Marks & Spencer - Value: £130,000 - Duration: 35 weeks - Architect: WD & RT Taggarts

M&S Belfast

M&S Belfast - Specialist Joinery

Client: Marks & Spencer - Value: £200,000 - Duration: 36 weeks - Architect: WD & RT Taggarts

Food Court @ Castle Court

Food Court @ Castle Court - Specialist Joinery

Client: Castle Court, Westfield - Value: £250,000 - Duration: 15 weeks - Architect: 3D Architects

BTWShiells

BTWShiells - Specialist Joinery

Client: BTWShiells - Value: £100,000 - Duration: 30 weeks - Architect: Jan Madill Design Consultants

Marshes SC

Marshes SC - Specialist Joinery

Client: Marshes Ltd. - Value: £870,000 - Duration: 40 weeks - Architect: WD & RT Taggarts

Buchanan House

Buchanan House - Specialist Joinery

Client: Stannifer Developments - Value: £300,000 - Duration: 40 weeks - Architect: Cooper Cromar

G1 Glasgow

G1 Glasgow - Specialist Joinery

Client: Dragon Developments - Value: £600,000 - Duration: 33 weeks - Architect: Cooper Cromar

Borders College

Borders College - Specialist Joinery

Client: Borders College - Value: £200,000 - Duration: 88 weeks - Architect: SMC Parr Architects

James Young High

James Young High - Specialist Joinery

Client: West Lothian Council - Value: £225,000 - Duration: 72 weeks - Architect: SMC Parr Architects

St Kentigerns Academy

St Kentigerns Academy - Specialist Joinery

Client: West Lothian Council - Value: £250,000 - Duration: 78 weeks - Architect: SMC Parr Architects

Shortlees Primary School

Shortlees Primary School - Specialist Joinery

Client: Hochtief - Value: £150,000 - Duration: 86 weeks - Architect: SMC Parr Architects

St Josephs Academy

St Josephs Academy - Specialist Joinery

Client: Hochtief - Value: £250,000 - Duration: 91 weeks - Architect: SMC Parr Architects

Nendrum College

Nendrum College - Specialist Joinery

Client: SEELB / Hochtief - Value: £150,000 - Duration: 102 weeks - Architect: McAdam Design

Bangor Academy

Bangor Academy - Specialist Joinery

Client: SEELB / Hochtief - Value: £300,000 - Duration: 113 weeks - Architect: McAdam Design

Abbeycentre V11

Abbeycentre V11 - Frameworks

Client: Abbeycentre - Value: £150,000 - Duration: 10 weeks - Architect: WD & RT Taggarts

James Young High

James Young High - Frameworks

Client: West Lothian Council - Value: £345,000 - Duration: 72 weeks - Architect: SMC Parr Architects

St Kentigerns Academy

St Kentigerns Academy - Frameworks

Client: West Lothian Council - Value: £725,000 - Duration: 78 weeks - Architect: SMC Parr Architects

Tesco Kilmarnock

Tesco Kilmarnock - Frameworks

Client: Tesco / Barr Construction - Value: £140,000 - Duration: 6 weeks - Architect: Barr Technical Services

Victoria Terminal 4

Victoria Terminal 4 - Frameworks

Client: Belfast Harbour Commissioners - Value: £250,000 - Duration: 53 weeks - Architect: Hobert & Heron

Shortlees Primary School

Shortlees Primary School - Frameworks

Client: Hochtief - Value: £340,000 - Duration: 86 weeks - Architect: SMC Parr Architects

Royal Victoria Hospital

Royal Victoria Hospital

Client: Royal Group of hospitals - Value: £5,000,000 - Duration: 36 weeks - Architect: Scott Wilson

St Josephs Academy

St Josephs Academy - Frameworks

Client: Hochtief - Value: £670,000 - Duration: 91 weeks - Architect: SMC Parr Architects

Nendrum College

Nendrum College - Frameworks

Client: SEELB / Hochtief - Value: £300,000 - Duration: 102 weeks - Architect: McAdam Design

Bangor Academy

Bangor Academy - Frameworks

Client: SEELB / Hochtief - Value: £700,000 - Duration: 113 weeks - Architect: McAdam Design

Lesley Exchange 2

Lesley Exchange 2

Client: Lebrah Ltd - Value: £1,000,000 - Duration: 35 weeks - Architect: Coogan & Co

RBS Ulster Bank University Road

RBS Ulster Bank University Road

Client: Royal Bank Of Scotland - Value: £800,000 - Duration: 9 weeks - Architect: Mace Ltd

Three Mile Water Viaduct

Three Mile Water Viaduct

Client: Translink - Value: £395,000 - Duration: 20 weeks - Engineer: Doran Consulting

CSA Adelaide Street

CSA Adelaide Street

Client: Central Services Agency - Value: £3,500,000 - Duration: 60 weeks - Architect: Hall, Black, Douglas

Turbine Grid connection

Turbine Grid connection

Client: Open Hydro - Value: £1,100,000 - Duration: 40 weeks - Engineer: RPS

Standard Life Office

Standard Life Office

Client: The Standard Life Assurance Company - Value: £700,000 - Duration: 19 weeks - Architect: Standard Life

RBS Ulster Bank Belfast

RBS Ulster Bank Belfast

Client: Royal Bank Of Scotland - Value: £100,000 - Duration: 26 weeks - Architect: Mace Ltd

Queens Buildings Belfast

Queens Buildings Belfast

Client: Queens Buildings - Value: £5,000,000 - Duration: 50 weeks - Architect: WDR & RT Taggart

Charles Hurst Specialist Cars

Charles Hurst Specialist Cars

Client: Charles Hurst - Value: £370,000 - Duration: 7 weeks - Architect: Taylor Design

Ulster Reform Club

Ulster Reform Club

Client: Ulster Reform Club - Value: £832,000 - Duration: 20 weeks - Architect: Robinson McIlwaine

BTWShiells Belfast

BTWShiells Belfast

Client: BTWShiells - Value: £1,360,000 - Duration: 20 weeks - Architect: Jan Madill

Northern Bank Donegall Square

Northern Bank Donegall Square

Client: Northern Bank Ltd - Value: £3,800,000 - Duration: 49 weeks - Architect: JCP Consulting

Sprucefield Park

Sprucefield Park

Client: Sprucefield Parks Ltd - Value: £12,000,000 - Duration: 35 weeks - Architect: CHQ Partnership

Octagon Centre

Octagon Centre

Client: Mourant Property Trustees Ltd - Value: £10,200,000 - Duration: 48 weeks - Architect: Leslie Jones

Train Cleaning Facility

Train Cleaning Facility

Client: Northern Ireland Railways - Value: £9,000,000 - Duration: 52 weeks - Engineer: Robinson Patterson Partnership Ltd

Larne Education Centre

Larne Education Centre

Client: East Antrim Institute - Value: £1,500,000 - Duration: 40 weeks - Architect: Scott Wilson

Coleraine Molecular Bioscience

Coleraine Molecular Bioscience

Client: University of Ulster - Value: £8,000,000 - Duration: 60 weeks - Architect: GM Design

TEIC Building

TEIC Building

Client: University of Ulster - Value: £2,000,000 - Duration: 39 weeks - Architect: Samuel Stevenson & Sons

Mossley Bridge Widening

Mossley Bridge Widening

Client: Translink - Value: £311,000 - Duration: 20 weeks - Engineer: WDR & RT Taggart

Dundalk Link Road

Dundalk Link Road

Client: Dundalk Council - Value: £4,200,000 - Duration: 72 weeks - Engineer: Kavanagh Mansfield & Partners

Dollingstown Roundabout

Dollingstown Roundabout

Client: DRD Road Service - Value: £225,000 - Duration: 16 weeks - Engineer: DRD Road Service

Asda Westwood

Asda Westwood

Client: Asda Stores Ltd - Value: £1,900,000 - Duration: 8 weeks - Architect: HGP Architects

M5 Access bridge

M5 Access bridge

Client: Patton Developments - Value: £470,000 - Duration: 52 weeks - Engineer: Park Hood

Abbeycentre Surgery

Abbeycentre Surgery

Client: Abbeycentre Ltd - Value: £650,000 - Duration: 14 weeks - Architect: Hall Black Douglas

Musgrave Park Hospital

Musgrave Park Hospital

Client: Greenpark Trust - Value: £1,375,000 - Duration: 50 weeks - Architect: Building Design Partnership

Mitre Trust Building

Mitre Trust Building

Client: Mitre Trust - Value: £3,000,000 - Duration: 58 weeks - Architect: McVeigh Brown Partnership

M&S Mary Street Dublin

M&S Mary Street Dublin

Client: Marks & Spencer - Value: £10,000,000 - Duration: 21 weeks - Architect: LSH

RBS Ulster Bank Antrim

RBS Ulster Bank Antrim

Client: Royal Bank Of Scotland - Value: £100,000 - Duration: 26 weeks - Architect: Mace Ltd

Penneys Blanchardstown

Penneys Blanchardstown

Client: Primark Stores Ltd - Value: £4,690,000 - Duration: 38 weeks - Architect: Hannigan Hogan Maguire

RBS Ulster Bank Shaftsbury Square

RBS Ulster Bank Shaftsbury Square

Client: Royal Bank Of Scotland - Value: £100,000 - Duration: 26 weeks - Architect: Mace Ltd

M&S Boucher Road

M&S Boucher Road

Client: Marks & Spencer - Value: £3,000,000 - Duration: 12 weeks - Architect: Lewis & Hickey

RBS Ulster Bank Lisburn

RBS Ulster Bank Lisburn

Client: Royal Bank Of Scotland - Value: £750,000 - Duration: 8 weeks - Architect: Mace Ltd

RBS Ulster Bank Anderstown

RBS Ulster Bank Anderstown

Client: Royal Bank Of Scotland - Value: £750,000 - Duration: 13 weeks - Architect: Mace Ltd

M&S, Foyleside

M&S, Foyleside

Client: Marks & Spencer - Value: £3,000,000 - Duration: 18 weeks - Architect: David

Downpatrick Bus Depot

Downpatrick Bus Depot

Client: Translink - Value: £2,000,000 - Duration: 43 weeks - Architect: Robinson Frizzell

Forestside Carpark

Forestside Carpark

Client: Forestside Ltd - Value: £2,000,000 - Duration: 26 weeks - Architect: WDR & RT Taggart

Ballyclare Bus Depot

Ballyclare Bus Depot

Client: Translink - Value: £260,000 - Duration: 28 weeks - Architect: GM Design

Equality House

Equality House

Client: Marshgold Enterprises - Value: £4,000,000 - Duration: 34 weeks - Architect: Hughes McMichael

Amicus Offices, Belfast

Amicus Offices, Belfast

Client: Amicus - Value: £2,000,000 - Duration: 52 weeks - Architect: Sean McLaughlin

Liffey Valley Eason Extension

Liffey Valley Eason Extension

Client: Quarry Vale 2, Quarry Vale 3 - Value: £706,200 - Duration: 18 weeks - Architect: Duffy Mitchell & O'Donoghue

M&S Simply Food Cookstown

M&S Simply Food Cookstown

Client: Marks & Spencer - Value: £2,000,000 - Duration: 10 weeks - Architect: Lewis & Hickey

Translink Rock stabilisation

Translink Rock stabilisation

Client: Translink - Value: £1,500,000 - Duration: 102 weeks - Engineer: Scott Wilson

Buttercrane

Buttercrane

Client: Buttercrane Shopping Centre - Value: £855,000 - Duration: 26 weeks - Architect: WDR & RT Taggart

Treatment of wetspots

Treatment of wetspots

Client: Translink - Value: £670,000 - Duration: 32 weeks - Engineer: Turner & Townsend

Larne to Whitehead track renewal

Larne to Whitehead track renewal

Client: Translink - Value: £525,000 - Duration: 12 weeks - Engineer: Scott Wilson

Accomodation overbridges

Accomodation overbridges

Client: Translink - Value: £792,000 - Duration: 68 weeks - Engineer: Atkins

The Quay, Phase 1

The Quay, Phase 1

Client: McLaughlin & Harvey - Value: £4,000,000 - Duration: 86 weeks - Architect: Halliday Fraser Munroe

The Quay, Phase 2

The Quay, Phase 2

Client: McLaughlin & Harvey - Value: £1,611,000 - Duration: 60 weeks - Architect: BDS Povall Worthington

The Quay, Phase 3

The Quay, Phase 3

Client: McLaughlin & Harvey - Value: £1,832,000 - Duration: 82 weeks - Architect: Povall Worthington

12 Adelaide Park

12 Adelaide Park

Client: McLaughlin & Harvey - Value: £850,000 - Duration: 46 weeks - Architect: Des Ewing Architects

Seaver House

Seaver House

Client: McLaughlin & Harvey - Value: £1,000,000 - Duration: 36 weeks - Architect: Consarc Design Group

Rock House

Rock House

Client: TBF Thompson Ministries limited. - Value: £369,000 - Duration: 26 weeks - Architect: 20/20 Architects

Saltpans Portaferry

Saltpans Portaferry

Client: McLaughlin & Harvey - Value: £4,500,000 - Duration: 69 weeks - Architect: Halliday Fraser Munroe

M&S, Clonmel

M&S, Clonmel

Client: Marks & Spencer - Value: £1,960,000 - Duration: 12 weeks - Architect: WDR & RT Taggart

M&S, Navan

M&S, Navan

Client: Marks & Spencer - Value: £6,300,000 - Duration: 11 weeks - Architect: WDR & RT Taggart

Charles Hurst

Charles Hurst

Client: Charles Hurst Ltd - Value: £330,000 - Duration: 10 weeks - Architect: Taylor Design

Asda Dundonald

Asda Dundonald

Client: Asda - Value: £1,250,000 - Duration: 8 weeks - Architect: HGP Architects

Lookers Renault Altringham

Lookers Renault Altringham

Client: Lookers Plc - Value: £1,280,000 - Duration: 21 weeks - Architect: Taylor Design

Swords Pavillion S.C.

Swords Pavillion S.C.

Client: Intrust Properties - Value: £14,000,000 - Duration: 65 weeks - Architect: OMS Architects

Sainsbury's Fit-out

Sainsbury's Fit-out

Client: Sainsbury's - Value: £7,000,000 - Duration: 8 weeks - Architect: CHQ Partnership

D5 Holywood Exchange

D5 Holywood Exchange

Client: Acquis Estates & Anglia - Value: £10,200,000 - Duration: 34 weeks - Architect: Hobart & Heron

Flagship Centre, Bangor

Flagship Centre, Bangor

Client: Herbel Properties - Value: £2,000,000 - Duration: 3 weeks - Architect: Coogan & Company

Granville Cold Stores

Granville Cold Stores

Client: Granville Food Care - Value: £4,000,000 - Duration: 36 weeks - Architect: Bryson Architects

Johnston Prams

Johnston Prams

Client: Grange Limited - Value: £1,450,000 - Duration: 25 weeks - Architect: Hobart & Heron

Trench Road

Trench Road

Client: Grange Limited - Value: £1,240,000 - Duration: 22 weeks - Architect: Hobart & Heron

Acheson & Glover

Acheson & Glover

Client: Acheson & Glover - Value: £2,527,000 - Duration: 41 weeks - Architect: Armstrong & Taylor

Victoria Terminal 4

Victoria Terminal 4

Client: Belfast Harbour Commissioners - Value: £6,500,000 - Duration: 53 weeks - Architect: Hobart Herron

Interactive

Interactive

Client: Grange Limited - Value: £1,200,000 - Duration: 15 weeks - Architect: Hobart & Heron

Klargester, Newry

Klargester, Newry

Client: Klargester Environmental Treatment Systems - Value: £2,550,000 - Duration: 24 weeks - Architect: Hughes McKnight

6 Ster Century Cinemas

6 Ster Century Cinemas

Client: Stannifer / Ster Century - Value: £29,800,000 - Duration: 30 weeks - Architect: Frame International Ltd

Lough Ryan Marine site

Lough Ryan Marine site

Client: Stena Line - Value: £1,200,000 - Duration: 24 weeks - Engineer: RPS

Harbour Works

Harbour Works

Client: Port of Larne

York Dock Quay Repairs

York Dock Quay Repairs

Client: Belfast Harbour Commissioners - Value: £326,000 - Duration: 28 weeks - Engineer: RPS

Stranraer Fender Replacement

Stranraer Fender Replacement

Client: Stena Line - Value: £340,000 - Engineer: RPS

Killynure Lough Drain

Killynure Lough Drain

Client: Rivers Agency - Value: £3,200,000 - Duration: 76 weeks - Engineer: WDR & RT Taggart

Marine Plant Charter

Marine Plant Charter

Client: Various - Value: £2,000,000 - Engineer: RPS

Orkney Tidal energy device

Orkney Tidal energy device

Client: Open Hydro - Value: £3,500,000 - Duration: 28 weeks - Engineer: RPS

Subsea Base Deployment

Subsea Base Deployment

Client: OpenHydro - Value: £1,000,000 - Duration: 24 weeks - Engineer: RPS

Refurbishment of 40 retail stores

Refurbishment of 40 retail stores

Client: The co-operative - Value: £4,000,000 - Duration: 208 weeks - Architect: Clarke Shipway

Irish Facilities Management Provision

Irish Facilities Management Provision

Client: Marks & Spencer - Value: £4,000,000 - Duration: 208 weeks - Architect: None

Regional Facility Management Services

Regional Facility Management Services

Client: Various - Value: £1,000,000

Distribution Warehouse Works and FM

Distribution Warehouse Works and FM

Client: Marks & Spencer - Value: £14,000,000 - Duration: 208 weeks

Refurbishment works to 96 bank premises

Refurbishment works to 96 bank premises

Client: RBS Ulster Bank - Value: £20,000,000 - Duration: 208 weeks - Architect: Mace